Land North of Dallas Is Being Repriced
A generation of North Texas growth moved north from Dallas in rings — Frisco, Texas, then Prosper and Celina, Texas. The next ring is now forming in Grayson County, where Sherman, Texas and Denison, Texas sit at the center of two converging forces: a semiconductor campus of national scale, and a national wave of data center development searching for jurisdictions that will receive it.
This guide explains what is driving land values in the corridor, what concludes on November 24, 2026, and how landowners and buyers are positioning ahead of it.
Texas Instruments and the Sherman Campus
Texas Instruments is building out a campus of approximately 1,200 acres in Sherman, Texas — an investment reported at more than $30 billion. Production began at the first fabrication plant in December 2025.
A campus of this scale does not occupy a single site in isolation. It draws suppliers, contractors, housing, and services into the surrounding county, and it reprices the land within reach of it — first the tracts suited to industrial and commercial use, then the residential growth path that follows the workforce.
The Displacement Effect: Development Is Moving
Across the United States, 583 local bans and moratoriums across 46 states now restrict data center development. The building is not stopping; it is moving — toward the jurisdictions that welcome it, with the land and the permitting posture to receive it.
Grayson County is one of those jurisdictions. For landowners in Sherman, Texas and Denison, Texas, the question is no longer whether corridor demand arrives. The question is whether a given tract is positioned — in zoning, utilities, and access — when it does.
November 24, 2026: The Corridor Assessments Conclude
Grayson County and the City of Sherman are completing infrastructure and zoning assessments for the reported $45 billion campus planned in the corridor. Those assessments conclude on November 24, 2026.
Assessments of this kind convert uncertainty into public record: where infrastructure will be built, what it will serve, and which land it makes developable. Positioning — for a landowner considering a sale, or a buyer considering an acquisition — is materially different before that record exists than after it.
Sherman, Denison, and the Shape of the Corridor
Sherman, Texas is the corridor anchor: the Texas Instruments campus, the reported $45 billion campus under assessment, and the county seat of Grayson County. Denison, Texas, immediately to the north, carries the corridor industrial land and its next tier of scale positions.
Both cities sit on the US-75 corridor north of Dallas, in the path of the long northward expansion of the metro — close enough to draw on the workforce and capital of Dallas, Texas, with land still available at a scale the built-out suburbs no longer offer.
For Landowners: What Positioning Requires
A tract in the corridor carries two values: what it is today, and what the corridor makes of it. The distance between those two values is determined by entitlement status, proximity to planned infrastructure, utility access, and timing relative to the November 24 assessments.
Before a sale is considered, a landowner benefits from knowing which of those factors a specific parcel holds, which it lacks, and what the assessment record is likely to change. That analysis — parcel by parcel, against the corridor as it will exist rather than as it exists — is the foundation of pricing a Grayson County tract correctly.
Five Confirmed Positions in the Corridor
Five land positions in Denison, Texas and Sherman, Texas have been confirmed in NTREIS and Grayson County records and are detailed in the Far North Texas Land Briefing — acreage, pricing, and the positioning of each. Complete property addresses are provided to confirmed clients.
Request the complimentary briefing to review the five positions in full, and the complimentary Data Center Displacement briefing for the national picture behind the corridor.
For Buyers and Investors: Underwriting What Land Becomes
Corridor land is not underwritten on what it is. It is underwritten on what it becomes — the entitlement it can carry, the infrastructure money moving toward it, and the demand wave that follows a campus of this scale over the coming decade.
That discipline separates the tracts that merely sit near the corridor from the tracts the corridor will actually absorb. It is the analysis applied to every position in the Far North Texas Land Briefing, and it is the analysis a buyer should require before any acquisition in Grayson County.
Prepared by Tom Ricci
This guide was prepared by Tom Ricci, Private Client Real Estate Advisor with Johnston & Ricci Realty Group, Coldwell Banker Apex, Realtors — advising landowners, families, and investors across the North Texas growth corridor, from Frisco, Texas and Plano, Texas to Sherman, Texas and Grayson County.
To discuss a parcel or a position in the corridor, schedule a private consultation at calendly.com/tomricci-texas/private-consultation, or call 972.861.0888.
Key Takeaways
- Land North of Dallas Is Being Repriced: A generation of North Texas growth moved north from Dallas in rings — Frisco, Texas, then Prosper and Celina, Texas.
- Texas Instruments and the Sherman Campus: Texas Instruments is building out a campus of approximately 1,200 acres in Sherman, Texas — an investment reported at more than $30 billion.
- The Displacement Effect: Development Is Moving: Across the United States, 583 local bans and moratoriums across 46 states now restrict data center development.
- November 24, 2026: The Corridor Assessments Conclude: Grayson County and the City of Sherman are completing infrastructure and zoning assessments for the reported $45 billion campus planned in the corridor.